NEW CONCRETEANCHORING BOTTOM
A reinforced concrete anchor plate is added to the STRONG ID2000 mm pumping station during production, to which three reinforced concrete anchor parts must be added in the trench.
The dimensions and reinforcement of the anchoring plate are designed taking into a account that the pumping station, if properly installed, remains firmly in the ground to the maximum possible extent at groundwater level.
TANK CYLINDER
- PE100
- EN 13476
- 100% recyclable
ANCHORING BOTTOM
- PE100 / reinforced concrete
- Concrete class: C35/45
- Environment class: XC2
ANCHORING PARTS
- PE100 / reinforced concrete
- Concrete class: C35/45
- Environment class: XC2