NEW CONCRETEANCHORING BOTTOM
A reinforced concrete anchor plate is added to the STRONG ID2000 mm pumping station during production, to which three reinforced concrete anchor parts must be added in the trench.
The dimensions and reinforcement of the anchoring plate are designed taking into a account that the pumping station, if properly installed, remains firmly in the ground to the maximum possible extent at groundwater level.



TANK CYLINDER
- PE100
- EN 13476
- 100% recyclable

ANCHORING BOTTOM
- PE100 / reinforced concrete
- Concrete class: C35/45
- Environment class: XC2

ANCHORING PARTS
- PE100 / reinforced concrete
- Concrete class: C35/45
- Environment class: XC2
ID2000 PUMPING STATION BOTTOM AND ANCHORING PARTS




INSTALLATION OF THE ANCHORING PARTS OF THE ID2000 PUMPING STATION





